IREN Limited logo

IREN Limited

NASDAQ:IRENLive AI agent

IREN is focused on providing AI cloud solutions powered by 100% renewable energy.

Investor website: https://iren.com/

About

IREN is focused on providing AI cloud solutions powered by 100% renewable energy. Their infrastructure is designed for high-performance AI workloads, ensuring operational efficiency and reliability with 24/7 customer support. IREN's data centers are strategically located across North America, emphasizing their commitment to sustainable energy and advanced technology.

Verified company data

Projects
["### Canal Flats BC, Canada\nLocated on a 10-acre freehold site, the facility boasts dual, physically diverse fiber paths and is directly connected to the BC Hydro power grid via a 30MW on-site substation owned by IREN.\n\nAI Cloud\n- [Reserve your cluster](https://iren.com/contact-sales)\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\n\n## Canal Flats Data Center\nBC, CAN\n\nAir-Cooled\n\n## Canal Flats\nPower Capacity30MW\nPUE (avg.)1.1PUE\nMax Rack Density70kW","### Prince George BC, Canada\nLocated on a 12-acre freehold site, the Prince George facility boasts dual, physically diverse fiber paths and is directly connected to the BC Hydro power grid via an on-site substation owned by IREN.\n\nAI Cloud\n- [Reserve your cluster](https://iren.com/contact-sales)\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\n\n## Prince George Data Center\nLocated on a 12-acre freehold site, the facility boasts dual, physically diverse fiber paths and is directly connected to the BC Hydro power grid via an on-site substation owned by IREN. Equipped with state-of-the-art GPU compute racks for the most demanding AI workloads.\n\nBC, CAN\n\nAir-Cooled\n\n## Prince George\nPower Capacity50MW\nPUE (avg.)1.1PUE\nMax Rack Density70kW","### Sweetwater TX, USA\nIREN’s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\n\nAI Cloud\n- [Reserve your cluster](https://iren.com/contact-sales)\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\n\n## Sweetwater Data Centers\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\n\nSWEETWATER TX, USA\n\nAir + Liquid Cooling\n\n## Sweetwater 1\n2026 Substation Energization\nUNDER CONSTRUCTION\nPower Capacity1,400MW\nLand1,700Acres\n\nSWEETWATER TX, USA\n\nAir + Liquid Cooling\n\n## Sweetwater 2\n2027 Substation Energization\nUNDER CONSTRUCTION\nPower Capacity600MW\nLand500Acres"]
Leadership
David Bartholomew (Independent Chair), Mike Alfred (Independent Non-Executive Director), Chris Guzowski (Independent Non-Executive Director), Sunita Parasuraman (Independent Non-Executive Director), Daniel Roberts (Co-Founder and Co-CEO), Will Roberts (Co-Founder and Co-CEO), Anthony Lewis (Chief Financial Officer), David Shaw (Chief Operating Officer), Kent Draper (Chief Commercial Officer), Denis Skrinnikoff (Chief Technology Officer), Cesilia Kim (Chief Legal Officer), John Gross (Chief Innovation Officer), Chris Parker (Chief Marketing Officer), Kambiz Aghili (Chief Product Officer), Michael Nudelman (Chief Development Officer)

Verified data last updated:

Recent filings