Cambria Gold logo

Cambria Gold

TSXV:CAMBLive AI agent

Cambria Gold Mines is a Canadian gold development company focused on advancing a high-grade gold system in British Columbia’s Golden Triangle.

Investor website: https://cambriagold.com/

About

Cambria Gold Mines is a Canadian gold development company focused on advancing a high-grade gold system in British Columbia’s Golden Triangle. The company aims to build durable, long-life operations by aligning geology, infrastructure, and capital discipline, with a commitment to responsible development practices and long-term partnerships with communities and Indigenous Nations.

Verified company data

Cash position
$47,028
Shares outstanding
422000000
Fully diluted shares
608250000
Mineral resource
The Premier Gold Mine hosts a substantial gold and silver resource across multiple underground deposits, reflecting its long history of exploration and production. The resource base provides meaningful scale and long-term optionality, with opportunities to improve confidence through targeted infill drilling as part of Cambria’s phased redevelopment strategy. ## Premier Area Resource Estimate at a 3.5g/t AuEq Cut-off - Effective date: December 12, 2019 | Class | Deposit | In-situ Tonnage (kt) | In-situ Grades | Metal | | --- | --- | --- | --- | --- | | AuEq (g/t) | Au (g/t) | Ag (g/t) | Au (koz) | Ag (koz) | | --- | --- | --- | --- | --- | | Indicated | Premier | 1,298 | 8.90 | 8.46 | 64.20 | 353 | 2,680 | | Big Missouri | 1,116 | 8.48 | 8.36 | 16.90 | 300 | 607 | | Silver Coin | 1,597 | 7.77 | 7.61 | 23.00 | 390 | 1,181 | | Martha-Ellen | 130 | 5.80 | 5.47 | 48.00 | 23 | 201 | | Dilworth | - | - | - | - | - | - | | **Total Indicated** | **4,141** | **8.25** | **8.01** | **35.1** | **1,066** | **4,669** | | Inferred | Premier | 1,753 | 7.00 | 6.72 | 39.80 | 379 | 2,243 | | Big Missouri | 1,897 | 8.44 | 8.34 | 14.70 | 508 | 896 | | Silver Coin | 523 | 7.19 | 7.03 | 23.20 | 118 | 390 | | Martha-Ellen | 653 | 6.36 | 6.12 | 34.30 | 129 | 720 | | Dilworth | 235 | 6.51 | 6.13 | 56.10 | 46 | 424 | | **Total Inferred** | **5.061** | **7.45** | **7.25** | **28.7** | **1,180** | **4,673** | - arrow_right [#349]Created with Sketch.1. Mineral Resources are estimated at a cut-off grade of 3.5 g/t AuEq based on metal prices of US$1,300/oz Au and US$20/oz Ag. - arrow_right [#349]Created with Sketch.2. The AuEg values were calculated using US$1,300/oz Au, US$20/oz Ag, a silver metallurgical recovery of 45.2%, and the following equation: AuEq = Au g/t + (Ag g/t x 0.00695). - arrow_right [#349]Created with Sketch.3. A mean bulk density of 2.85 t/m3 is used for Premier and of 2.80 t/m3 for all other deposit areas. - arrow_right [#349]Created with Sketch.4. A minimum mining width of 2.5 m true thickness is required to be classified as Resource material. - arrow_right [#349]Created with Sketch.5. Numbers may not add due to rounding. The majority of the Premier resource is hosted within structurally controlled epithermal gold-silver systems typical of the Golden Triangle. Mineralization occurs in veins, breccias, and stockwork zones, resulting in variable geometry and grade continuity across deposits.
Projects
["## Premier Gold\n\n### Gold • Stewart BC\n\nA historic mining complex with significant existing infrastructure, including a permitted mill, underground development, and surface facilities.\n\n- [Corporate Presentation](https://cambriagold.com/presentation-link/)\n\n- [Technical Report](https://cambriagold.com/projects/premier/#)\n\n[- Overview](https://cambriagold.com/projects/premier/#Overview) [- Highlights](https://cambriagold.com/projects/premier/#Highlights) [- Resource Estimate](https://cambriagold.com/projects/premier/#Resource-Estimate) [- Timeline](https://cambriagold.com/projects/premier/#Timeline) [- Geology](https://cambriagold.com/projects/premier/#Geology) [- Infrastructure](https://cambriagold.com/projects/premier/#Infrastructure)\n\n### Project Overview\n\nThe Premier Gold Project is a historic underground gold–silver system located in British Columbia’s Golden Triangle, approximately 25 kilometres from Stewart, on Nisg̱a’a Nation Treaty Lands. The project includes multiple deposits—Premier, Silver Coin, Big Missouri, Dilworth, and Martha Ellen—and a fully permitted processing facility with a nominal capacity of approximately 2,500 tonnes per day.\n\nPremier hosts an intermediate-sulfidation epithermal gold–silver system, with mineralization occurring in structurally controlled veins, breccias, and stockwork zones associated with quartz–sericite–pyrite alteration. The system is well understood through extensive historical drilling, underground development, and production data.\n\nWithin Cambria’s development strategy, Premier serves as the infrastructure and processing hub, while Red Mountain is prioritized as the initial source of high-confidence mill feed. Premier is positioned as a secondary production source over time, with contribution expected to increase as resource confidence improves through targeted infill drilling.\n\nPremier combines scale, existing infrastructure, and geological endowment, providing long-term flexibility and optionality within Cambria’s disciplined, phased restart plan.\n\n### Project Highlights\n\nThe Premier Gold Project is a past-producing, multi-deposit underground operation with established reserves, a permitted 2,500 tpd processing facility, and significant site infrastructure in place. Located in the heart of the Golden Triangle, Premier provides the operational platform for Cambria’s staged restart strategy and long-term district development plan.\n\nHistoric, Infrastructure-Rich Gold Asset\n\nOne of the most established underground gold mining operations in the Golden Triangle, with a long production history and substantial existing infrastructure.\n\nOperating-Scale Processing Facility\n\nFully permitted mill with a nominal capacity of approximately 2,500 tonnes per day, positioned to process ore from Premier and Red Mountain.\n\nMultiple Deposits, Single Processing Hub\n\nFive defined underground deposits — Premier, Silver Coin, Big Missouri, Dilworth, and Martha Ellen — providing long-term optionality and development flexibility.\n\nAdvanced Technical Foundation\n\nSupported by extensive historical drilling, engineering studies, and a completed feasibility study, with an updated feasibility study planned.\n\nEstablished Access and Power\n\nLocated near Stewart, British Columbia, with paved road access, grid-connected hydroelectric power, and proximity to a deep-water port.\n\nStrategic Role in Cambria’s Development Plan\n\nPositioned as a secondary production source following Red Mountain, contributing additional mill feed over time as resource confidence is upgraded.\n\nPermitted and Previously Operated\n\nFully permitted underground mine and processing facility, with the site maintained under care and maintenance.\n\nSignificant Exploration and Development Upside\n\nLarge mineral inventory with opportunities to improve confidence through targeted infill drilling and staged redevelopment."]
Leadership
Joe Driscoll (Director, Mining executive with over 38 years of leadership experience in the global mining industry, including senior roles at Barrick and Newmont. He has expertise in both underground and surface mine operations.), Paul Saxton (Director, Experienced mining professional with a background in exploration and operations across various international mining projects. He has held executive roles and managed feasibility studies for multiple mining operations.), Ryan Weymark (EVP and Director, Mining executive with over 15 years of experience in project development and operations. He is the President and Co-Founder of Fuse Advisors Inc. and has held various technical and management roles in the mining sector.), Alex Morrison (Chair), Robert McLeod (CEO and Director), Andree St-Germain (Director), Jose Nestor Marun (Director)

Verified data last updated:

Recent filings